ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

What's an equivalent fraction for 10 15 by dividing
Evolution is: A) A change in the composition of a population from one generation to the next.B) A phenomenon that must be inferred from evidence, because it can
Use trig to solve for x show work
There is a turtle race. The race will last 2 minutes. I have to find the distance from the start each turtle will be at the end of the race. Speed (in inches pe
how does.debate in the senate differ from debate in the house?
What is the Geocentric theory in your own words?
y varies directly as x. if x=5 when y=12 find x when y=30
y varies directly as x. if x=5 when y=12 find x when y=30
The decline in medieval trade was caused by
Help please this I'd for geometry