henriquefvboas68241 henriquefvboas68241
  • 01-08-2022
  • Business
contestada

In general, the production manager is responsible for the materials price variance. True or false?.

Respuesta :

PallasAthena23
PallasAthena23 PallasAthena23
  • 01-08-2022
False

In general, materials price variance is the responsibility of the purchasing manager, not the production manager.
Answer Link

Otras preguntas

is the earth getting heavier
what does a 220 degree angle look like?
how many peanuts will each person get if 3 people share 1/5 pound of peanuts equally write and solve a division equation to represent the problem
are there forests in Hungary
15 is 70% of what number
THE FULL MOON TURNED ORANGE AND THEN GOT REALLY DARK WHAT COULD HAVE MADE IT TURN DARK LIKE THAT
Brody added a fraction to 5/6 to get 31/30. Use the equation a/b + c/d = (ad +bc)/ bd to find the fraction he added
In a short response of at least three complete sentences, define flash-forward and explain its effect on a traditional plot structure
How to make a mixed fraction
by what length is is 0.5 m less than 10.05