a contactor hired 150 men to pave a road in 30 days.how many mem will be hire to do the same work in 20 days​

Respuesta :

kevinmario2008 kevinmario2008
  • 05-12-2021

Answer:375

Step-by-step explanation:W = RTN

1 = 1/7500(20)N

1 = 20/7500N

1 = 2/750N

750(1 = 2/750N)

750 = 2N

750/2 = N

375 = N

There are 375 men to do the job in 20 days

Answer Link

Otras preguntas

Which idea is suggested by this excerpt
I need help with this question
allan has 84 baseball cards. this is 19 fewer cards than mike. how many baseball cards does mike have​
The temperature outside is 50 degrees. If the temperature increases 3 degrees every hour, for how many hours will the temperature be less than 71 degrees?
what is the volume of this pyramida.945 cm^3b. 1260 cm^3c.1890 cm^3d. 2520 cm^3​
solve this equation showing all work-4× -16× -24​
I haven’t got a response back from Brainly and I emailed them 3 days ago about my account. I was charged for the wrong membership! What do I need to do to talk
Complete this paragraph about the age of exploration by correctly filling in the missing information
When a government sees that local industry is threatened by imports, it can threaten to erect import barriers to stop or reduce these imports. this is an exampl
If cells A1=90,A2=85,A3=80,A4=75, A5=75.What will be the formula if you are going to get the formula total