reesealexnader1227 reesealexnader1227
  • 03-12-2020
  • Computers and Technology
contestada

When multiple architects work on a construction plan, which section of a construction plan will help them keep track of when the changes are made and by whom?
A.
framing plan
B.
schedule
C.
title block
D.
bill of materials

Respuesta :

katusukibakugoisgod
katusukibakugoisgod katusukibakugoisgod
  • 07-12-2020

Answer:

I believe that it is . A. framing plan

Explanation:

But I am not certain But I do know that it IS NOT B..

Answer Link
ewachi101 ewachi101
  • 26-08-2021

Answer:

the answer is schedule!!!

Explanation:

Answer Link

Otras preguntas

How will the behavior of the gases in the piston chamber change if heat is applied to the system? Assume the piston moves to keep the pressure constant. A) The
How can humans building a drainage system affect the water cycle?
Hello! can you help me please <3)
How long does It take for the sound of thunder to travel at 1485 m? Need answer ASAP!!
HALPPPPP PLZZZZZ SHOW WORKKKKKKK
complete the sentence below with the form of poder that is spelled correctly tu ir la fiestapoder podes pudesorpuedes
Which set of ordered pairs in the form of (x,y) does not represent a function of x? {(-1,2), (3,-2),(0,1),(5,2} {(-1,-2),(3,2),(-2,2),(0,2)} {(-1,2),(3,-2),(0,1
Please help me out with this *use the 2nd pic*
If you have 2 squares with the same side lengths are they still considerd scaled copies of each other?
complete the square: -3x^2 + 30x -52 express in vertex form